Construction of a footbridge linking the Town Hall with the former presbytery

To meet the needs of local residents, the municipal administration building is to be extended. A footbridge, accessible from the first floor of the administration building, will be built to link up with the former presbytery. The finance department (Receipts, Finance and Billing) will be housed in the new annex to the main building.

At the same time, the Place de l'Hôtel de Ville will be redeveloped: more greenery in the city centre, replacement of the toilet block near the church, modernisation of the local transformer, pedestrian and cyclist links from the "Rue Abbé Muller" to the "Place de l'Hôtel de Ville". Short-term parking spaces are planned.

This will enhance the Town Hall and make the surrounding area safer for visitors and children attending the primary school.

Work is scheduled to start in autumn 2023.

Estimated budget: 3.500.000 €

(translated by deepl.com)